3168彩票app下载手机版 Provide you with the application field, product details, technical parameters and installation dimensions of the power-off delay time relay -- [Zhejiang Geya Electric Co., Ltd.]

亚博APP二维码

  • National unified service hotline: 0577- 62852666

 Geya relay, 13 years of ingenuity and intelligence!

 Geya
Location: home page  >  Product Center  >  Grt8-d power-off delay time relay

Grt8-d power-off delay time relay

■ application
-It is used in the case of delayed shutdown of backup power supply (emergency lighting, voltage failure, emergency ventilator, fire door control).
■ features
-The delay range is 0.1s-10min (knob setting).
-With AC / DC 12v-240v ultra wide working voltage specification optional.
-The working state of relay is indicated by LED indicator.
-Ultra small size, only 18mm wide, 35mm rail installation.

 Power off delay type time relay functional parts: working power input, (green) power indicator, (red) status indicator, time gear selection (1s-10min), time percentage setting, product model: power-off delay type, a set of transfer contacts (16a / AC1) Application field of power-off delay time relay / comparison between old and new time relay Ultra wide working voltage of power-off delay time relay: 12v-240v Time delay type time relay has wide delay range: 0.1s-10min Geya time relay is smaller and smaller than its counterparts The working state of relay is indicated by LED indicator Product parameters: product brand: Geya Geya, product name: power-off delay time relay, model: grt8-d, voltage: AC / DC 12v-240v, power supply mode: AC, contact group number: 1 group, contact current: 16a, installation method: guide rail installation Details of Geya power-off delay time relay: 1. Convenient operation: panel adjustment knob setting, convenient and intuitive operation; 2. Auxiliary function output terminal (pause, control) is convenient for customer operation; 2. Stable performance: the line adopts full-automatic SMT process, stable and reliable performance and good consistency Details of power-off delay time relay 2: 3. Flame retardant enclosure: the shell is made of safety flame-retardant ppt material; 4. Tunnel terminal block: tunnel terminal, which is more reliable for crimping; Strength display of Geya manufacturers: 1. Foreign friends come to visit and negotiate with us; 2. Dust free workshop; 3. Relay production line; 4. Relay debugging; 5. Relay accessories processing; 6. Geya warehouse

technical parameter Technical parameters of time delay relay

Wiring diagram Wiring diagram of time delay relay

Function diagram

 Function diagram of time delay relay

Outline installation and dimension

 Installation and dimension of time delay relay

© Zhejiang Geya Electric Co., Ltd copyright